No source this site watches has published anything about Tramway du Mont-Blanc. That is a gap in our coverage, not a report that all is well β and it is why the status above says unknown rather than open.
Is any of this wrong? Tell us β a green dot on something shut is the failure this site exists to avoid.
Everything published about this
Never our own claim β each row links to whoever said it.
When
Status
What was said
Source
29 Sept, 22:08
unknown
Scheduled to run 13 Jun β 3 Jul 2026 (operator timetable, not a report that it is running)as published (French)